Casestudy: Goldcorp


Kozar Engineering Inc. worked with Goldcorp to engineer service upgrades to Underflow Slurry Pumps for the Tailings System.

 

Musselwhite Mine Underflow Slurry Pumps 

 

The intension of the upgrades to the Underflow Slurry Pump System was to install a complete working primary and booster pump, with one set operating and the other as an installed spare to transport final tailings further in the tailings pond.

The project included Mechanical and Civil Engineering elements. The scope of the Mechanical work included equipment layout drawings, piping layout drawings, piping specifications and control valve specifications. The Civil work included reviewing existing pedestals and the complete design and drawing for new pedestals and modified pedestals.  